<div dir="ltr">The construction around Arts Court will begin in earnest very soon. We are clearing the lab spaces as much as we can before the loading dock becomes inaccessible. We are asking everyone to pick up any items they may have stored in the lab before the end of the month. Anything still in the labs after July 1st will be considered unwanted. <div><br></div><div>We also want to take out the two large grey tables (with the heavy metal legs) and the 20 or so black curved chairs. The backs of the chairs are unsupported so not very suited for the lab. If anyone is interested in these items, let us know and they are yours to pick up this week. </div><div><br></div><div>Thanks!</div></div>