Ah, makes sense.<div><br></div><div>Instead of doing the switch at 0 then, maybe:</div><div><br></div><div>move to another known point that is clear, </div><div>calculate the software z position for a known physical height (like just touching the base)</div>

<div>adjust Z so you can change end mills</div><div>reposition Z physically to the known physical height, the difference in Z position is the offset?</div><div><br></div><div>Tom<br><br><div class="gmail_quote">On Wed, Apr 13, 2011 at 3:39 PM, Darcy Whyte <span dir="ltr">&lt;<a href="mailto:darcy@siteware.com">darcy@siteware.com</a>&gt;</span> wrote:<br>

<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex;"><div><div>Returning to zero will bring the spindle too low to withdraw the endmill from the chuck.</div><div><br></div>

<div>But even if I could, the length of the endmill sticking out the chuck will not be the same. I need to get it to be the same or move it to zero somehow and then rezero the z axis in the software.</div>

<div><br></div><div><br></div><div><br></div><div><br></div><div><br></div></div><div><div></div><div class="h5"><br>
<br><br><div class="gmail_quote">On Wed, Apr 13, 2011 at 3:33 PM, Tom Burns <span dir="ltr">&lt;<a href="mailto:tom.i.burns@gmail.com" target="_blank">tom.i.burns@gmail.com</a>&gt;</span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">



Having no practical experience with a CNC yet this is only a guess, but could you return to zero before switching endmills?  Or would you end up still having to estimate Z position.<br><br><div class="gmail_quote"><div><div>



</div><div>On Wed, Apr 13, 2011 at 3:30 PM, Darcy Whyte <span dir="ltr">&lt;<a href="mailto:darcy@siteware.com" target="_blank">darcy@siteware.com</a>&gt;</span> wrote:<br>

</div></div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div><div></div><div>I want to eventually do cnc cutting with multiple endmills. <div><br></div>

<div>Problem is I wont know where zero is for the work in progress. It&#39;s easy to estimate zero at the start and it works okay for cutting. But to continue work, an estimate wont do. It has to match. </div>



<div><br></div><div>Any ideas?</div><div><br clear="all"><br>--<br>Darcy Whyte<br><b>Darcy@Siteware.com</b><div>Ottawa, Canada | <a href="tel:613-563-3634" value="+16135633634" target="_blank">613-563-3634</a> | N 45° 25&#39;03.1&quot; W 75° 42&#39;21.4&quot;</div>





<div><span style="border-collapse:collapse;font-family:arial,sans-serif;font-size:13px">Please attach previous emails when responding (or reply instead of starting a new thread/subject).</span><br>

<br>Inspirational Flying Machines:<br><a href="http://www.rubber-power.com" target="_blank">http://www.rubber-power.com</a>: Squirrel<div><a href="http://www.endlessLift.com" target="_blank">http://www.endlessLift.com</a>: Simple Aviation</div>







<div><br></div><div><div>Art</div><div><a href="http://www.mambohead.com/" target="_blank">www.Mambohead.com</a></div></div><div><a href="http://www.Squirrelify.com" target="_blank"></a><br>Software Services (Since &#39;88)<br>







<a href="http://www.Siteware.com" target="_blank">www.Siteware.com</a>: Web, Database, LAMP</div><div><a href="http://www.generalSocial.com" target="_blank">www.generalSocial.com</a>: Social Network Theory<br></div><div>






<br>
</div><div><br></div><div><br></div><div><br></div><div><br></div></div><br>
</div>
<br></div></div>_______________________________________________<br>
Lab mailing list<br>
<a href="mailto:Lab@artengine.ca" target="_blank">Lab@artengine.ca</a><br>
<a href="http://artengine.ca/mailman/listinfo/lab" target="_blank">http://artengine.ca/mailman/listinfo/lab</a><br>
<br></blockquote></div><br>
</blockquote></div><br>
</div></div></blockquote></div><br></div>